Pemodelan Perhitungan Cadangan Batubara Dengan Perangkat Lunak Pada PT. Mitra Abadi Mahakam Provinsi Kalimantan Selatan

Avellyn Shinthya Sari, Minto Basuki, Satria Ambara Iriawan

Abstract

This company needs reserves calculation before doing mining activities such as coal deposit model construction, coal reserves calculation. and Stripping Ratio (SR) value calculation. As a result, it obtains the number of coal reserves which will coal deposit model. This fact became the background of the study. The reserves calculation was carried out by Triangular Method supported by Minescape software. The coal reserves calculation and coal deposit model of Mitra Abadi Mahakam Ltd.. The research result was a coal model which can be seen from the pictures on map attached in this final project report. The coal reserve was 2,347,827.44 tons, while the overburden volume of mining activity site was 8,318,130.05 BCM" and the Striping Ratio was 3.5. 

Keywords: coal, model, reserve, overburden


Full Text:

PDF

References

Anonim, 1999, Klasifikasi Sumberdaya dan Cadangan Batubara, SNI 13-6011, BSN.Jakarta.

Fourie, G. A and Dohm, G.C., 2001, Surface Mining Engineering Handbook : Open Pit Planning and design, Society for Mining, Metalurgy, and Exploration, Inc, Colorado,p. 1274-1275.

Haris, A. W. 2005. Modul Responsi TE-3231 Metode Perhitungan Cadangan. ITB. Bandung. Halaman 8-9.

Hartman, H.L., 1987, Introductory mining Engineering, Jhon Wiley & Sons Inc., New York, p.154.

Nurhakim.2008, Draft Bahan Kuliah Perencanaan dan Permodelan Tambang, Program Studi Teknik Pertambangan FT UNLAM. Banjarbaru. Halaman 4.

Sukandarrumidi, 1995. Batubara dan Gambut. Gadjah Mada. Yogyakarta, Halaman 18-24

Sulistyana B. Waterman. (2015). Perencanaan Tambang. Jurusan Teknik Pertambangan UPN “Veteran†Yogyakarta,.

William Hustrulid & Mark Kuchta. (1995). â€Open Pit Mine Planning Design†"Edition, A.A. Balkema/ Rotterdam/ Brockfield.

Refbacks

  • There are currently no refbacks.