ANALISIS REKAYASA NILAI PADA PEKERJAAN PLAT LANTAI PERUM BUKIT PALM B2 PT.CITRALAND SURABAYA
Abstract
Keywords
Full Text:
PDFReferences
Mulyanto, HR. (2009). Rekayasa Nilai dalam Modelling Contractor and Subcontracto, dari: http//eprints.undip.ac.id.
Chandra, S. C. (2013). Maximizing Contruction Project and Investment Budget Efficiency With Value Engineering. Jakarta: Kompas Gramedia.
Adha, K. (2013). Pengertian Analitycal Hierarchy Process (AHP). Diambil kembali dari Analitycal Hierarchy Process: http://metode-ahp.co.id.
Berawi, dkk. (2014). Enhancing Value for Money of Mega Infrastructure Projects Development Using Value Engineering Method. Journal Procedia Tech vol 16, pp 1037-1046.
Anisa W, dkk. (2013). Aplikasi Value Engineering dengan Metode Analytical Hirarchy Process (AHP) terhadap Struktur Plat pada Proyek Pembangunan Hotel Aziza Solo. Mahasiswa Teknik Sipil, Universitas Sebelas Maret. ISSN 2354-8630, e-jurnal Matrik Teknik Sipil Vol 1 No. 4/desermber 20133/401.
Suryadi, K., & Ramdhani, M. (1998). Sistem Pendukung Keputusan. Bandung: PT. Remaja, Rosda Karya.
Susanto, J. (2011 Desemeber 14). Sejarah Rekayasa Nilai di Indonesia. Refrensi dari: e-journa l.uajy. ac.id/8 95/3/2TS12386.pdf.
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 Prosiding Seminar Teknologi Perencanaan, Perancangan, Lingkungan dan Infrastruktur
This work is licensed under a Creative Commons Attribution 4.0 International License.