Analisa Penggunaan Over Current Relay (OCR) Sebagai Alat Proteksi Pada Transformator Daya Gardu Induk Sekarputih PT.PLN (PERSERO)

Mohammad Afif Irfansyah, Trisna Wati

Abstract


in the data at the Sekar Putih substation on a single side 70 kV transformer the short circuit disturbance is 14,505 kA for three phases and 0.647 kA for one phase to ground, while on the 150 kV side the three phase short circuit disturbance is 21,501 kA and 18,157 kA for one phase to ground . With this research, the aim of minimizing short circuit disturbances is that a relay is needed, namely the overcurrent relay (OCR), which is tasked with indicating the presence of short circuit currents occurring in the system. By increasing the OCR setting value using the PSO method, the TMS results and trip time (t) are very optimal. The results of this research show that the OCR setting on the OCR time setting (TMS) on a 150 kV single-sided transformer using the PSO method is 0.1124 seconds with a trip time (t) of 0.8191 seconds for a short circuit fault of 18,730 A, while using the manual calculation method TMS is 0.4 seconds with a trip time (t) of 1.237 seconds with a short circuit disturbance of 21.501 kA. Therefore, it can be concluded that by using the PSO method the TMS results and trip time (t) are faster and more efficient than using the conventional method.


Keywords


sistem proteksi over current relay

Full Text:

PDF

References


Y. Setyaningrum, S. Prasetyono, and A. Setiawan, “Optimasi Koordinasi Over Current Relay Pada Trafo 60 MVA 150/20 KV Dan Penyulang 20 KV Gumul Gardu Induk Banaran Berbasis Particle Swarm Optimazition,” J. Arus Elektro Indones., vol. 7, no. 1, pp. 1–9, May 2021, doi: 10.19184/JAEI.V7I1.21480.

F. I. Pasaribu, I. Roza, C. Siregar, and F. A. Sitompul, “Analisa Proteksi Over Current Relay Pada Jaringan Tegangan Menengah 20kV Di Pelindo 1 Cabang Belawan,” Repository.Umsu.Ac.Id, vol. 4, no. 1, pp. 18–26, 2021, [Online]. Available: http://repository.umsu.ac.id/handle/123456789/14738

F. Haz and I. Aditya M.N, “Analisis setting rele arus lebih dan rele gangguan tanah pada sistem proteksi transformator 60 MVA di gardu induk 150 KV Cibatu,” SinarFe7, vol. 18, pp. 66–73, 2020, [Online]. Available: http://ejournal.fortei7.org/index.php/SinarFe7/article/view/126

Z. Sya’roni and T. Rijanto, “Analisis Ketidakseimbangan Beban Transformator Distribusi 20 kV Dan Solusinya Pada Jaringan Tegangan Rendah,” Tek. Elektro, vol. 8, no. 1, pp. 173–180, 2019.

M. Rauf, “Evaluasi Kinerja Setting Proteksi Over Current Relay dan Ground Fault Relay Jaringan Distrbusi 20 kV pada Gardu Induk Pankkukang,” no. September, pp. 162–167, 2021.

D. Eko Rofianto, E. Arfah Zuliari, and T. Wati, “Analisa Perencanaan Pemasangan Differential Relay Pada PT.Bramindo Niaga Pratama,” Semin. Nas. Sains dan Teknol. Terap. VII - Inst. Teknol. Adhi Tama Surabaya, pp. 723–728, 2019.

H. Prasetijo, W. H. Purnomo, and E. Triwijaya, “Simulasi Koordinasi Relay Arus Lebih Pola Non-Kaskade,” Din. Rekayasa, vol. 16, no. 1, p. 1, 2020, doi: 10.20884/1.dr.2020.16.1.292.

W. F. Galla, A. S. Sampeallo, and J. I. Daris, “Analisis Gangguan Hubung Singkat Pada Saluran Udara 20 Kv Di Penyulang Naioni Pt. Pln (Persero) Ulp Kupang Untuk Menentukan Kapasitas Pemutusan Fuse Cut Out Menggunakan Etap 12.6,” J. Media Elektro, vol. IX, no. 2, pp. 101–112, 2020, doi: 10.35508/jme.v0i0.3208.




DOI: https://doi.org/10.31284/p.snestik.2024.5709

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Mohammad Afif Irfansyah

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.