DAMPAK DAN PENYEBAB VARIATION ORDER (VO) PADA PROYEK APARTEMEN ICON - GRESIK

Felicia Tria Nuciferani S.Pd., M.T., Siti Choiriyah, Feri Harianto, Fajar D.Y .Jatmiko

Abstract

The Construction of Icon Apartment Project are construction projects that have different cause variation orders. This research aims to determine the percentage of VO (Variation Order), the highest factor of VO, and the impact of VO. Data collection used questionnaires accompanied by an interview process with the project manager for each project. Data processing techniques use validity test, reliability test, and mean test. The results obtained in this study are the percentage of VO for the Caspian project 13.50% and the Icon project 11.30%. The highest VO factor for the Caspian project was extreme weather 4.80 and the Icon apartment was a design change of 4.6. The emergence of VO has an impact on the addition of costs and work schedules for each project.

Keywords

Variation Order, Questionnaire, Interview, VO Factor, and VO Impact

Full Text:

PDF

References

Barrie, Poulson D.S., Sudinarto B.C., (1992). Proffesional construction manajement thirt edition. Mc Graw-Hill: Singapore

Susilowati, O. F., & Risqi, A. (2017). Faktor yang paling berpengaruh terhadap waktu pelaksanaan pekerjaan konstruksi Studi Kasus Pembangunan Proyek Apartemen di Jakarta Selatan. ORBITH, 13(3), 199–203.

Widhiawati, I. A. R., Wiranata, A. A., & Wirawan, I. P. Y. (2016). Faktor-faktor penyebab change order pada proyek konstruksi gedung. Jurnal Ilmiah Teknik Sipil, 20(1), 1–7.

Nurmala, A. (2015). Penyebab dan dampak Variation Order (VO) pada pelaksanaan proyek konstruksi. Jurnal Konstruksia, 6(2), 63–77.

Nurlaela, sri dewi. (2013). Analisis faktor-faktor penyebab change order dan pengaruhnya yang dominan terhadap kinerja biaya pelaksanaan proyek konstruksi dilingkungan pemerintah provinsi maluku utara. Jurnal Ilmiah Media Engineering, 3(1), 42-48.

Refbacks

  • There are currently no refbacks.