Performance Evaluation of Projects using Earned Value Concept
Abstract
The construction project is one of the jobs that demands the final result to align with the planning, necessitating a check on the performance obtained during the project to address any deviations from the initial plan. The Earned Value method is one of the techniques that can be used to assess project performance based on cost and time. The objective of implementing an evaluation with the Earned Value method is to understand the project's performance based on value variances and performance indexes and to identify solutions as early as possible if the project is experiencing delays. Calculations using the Earned Value method are based on budgeted cost of work scheduled (BCWS), cost for work performed (BCWP), and actual cost of work performed (ACWP). The research results on the Gunung Anyar apartment project reveal that the project experienced a delay of 3 weeks from the initial plan and a cost overrun of IDR 21,863,495,000 from the budget of IDR 19,533,411,725 (-12%). From the evaluation, it is evident that the Earned Value method needs to be applied during the ongoing project, especially when facing delays, to find solutions as early as possible to overcome the issues and prevent further significant losses.
Keywords
Full Text:
PDFReferences
Junaidi, H. Tarore, G. Y. Malingkas, and D. R. O. Walangitan, “Pengendalian Waktu Dan Biaya Pada Tahap Pelaksanaan Proyek Dengan Menggunakan Metode Nilai Hasil (Studi Kasus : Proyek Lanjutan Pembangunan Gedung PIP2B Kota Manado),” J. Sipil Statik, vol. 1, no. 1, pp. 44–52, 2012.
A. Daulasi, J. B. Mangare, and D. R. O. Walangitan, “Kie Raha Ternate Dengan Metode Earned Value,” vol. 4, no. 2, 2016.
B. Susanti, M. Melisah, and I. Juliantina, “Penerapan Konsep Earned Value Pada Proyek Konstruksi Jalan Tol (Studi Kasus Ruas Jalan Tol Kayuagung - Palembang -Betung),” J. Rekayasa Sipil, vol. 15, no. 1, p. 12, 2019, doi: 10.25077/jrs.15.1.12-20.2019.
M. Dwitanto, E. Mulyani, and S. M Nuh, “Penerapan Konsep Nilai Hasil Pada Proyek Pembangunan Gedung Di Kota Pontianak Studi Kasus Pada Proyek Pembangunan Ruko 4 Lantai Di Jalan Pangeran Natakusuma, Pontianak,” pp. 1–15, 2017.
D. Warka, I Gede Putu; Handayani, Teti; Asmina, “Pengendalian Biaya dan Waktu Pada Proyek Pembangunan Gedung J (Irma Utama) RSU Provinsi NTB Menggunakan Metode Earned Value,” Spektrum Sipil, vol. 2, no. 2, p. 1, 2015.
M. Priyo and T. Zhafira, “Penerapan Metode ‘Earn Value’ Dan ‘Project Crashing’ Pada Proyek Konstruksi: Studi KasusPembangunan Gedung IGD RSUD Sunan Kalijaga, Demak ,” Semesta Tek., vol. 20, no. 1, pp. 29–50, 2017.
E. E. Pandelaki, E. Purwanto, D. Olivia, and W. Agung, “Faktor-faktor Pembentuk Kinerja Spasial Rumah Susun Kaitannya dengan Kepuasan Penghuni (Factors of Spatial Performance of Rental Public Housing with Occupants Satisfaction ),” Modul, vol. 15, no. 2, pp. 85–106, 2015.
Refbacks
- There are currently no refbacks.