Productivity Evaluation of Digging, Loading, and Hauling Equipment in Limestone Mining, PT Pertama Mina Sutra Perkasa, Jember, Indonesia

Raffaello Santoso, Fanteri Aji Dharma Suparno, Januar Fery Irawan

Abstract


The failure of meeting the productivity target often occurs in mining operations and is caused by several technical obstacles. PT Pertama Mina Sutra Perkasa set a productivity target of 80 tons/hour for loading and digging equipment and 35 tons/hour for transportation equipment. An analysis of factors that affect productivity needs to be studied in order to find out the causes of not achieving the productivity targets set by the company. This research was conducted on the limestone quarry of PT Pertama Mina Sutra Perkasa (PMSP) located in Grenden Village, Puger District, Jember Regency using quantitative research methods. Research begins with the formulation of problems and then data collection and processing. Data that has been processed and analyzed can then be the basis for determining efforts to improve the productivity of loading and transporting excavations. There are three loadings location not reached the productivity target. Not achieving tool productivity targets due to low work efficiency, suboptimal tool distribution time, and a combination of a less than ideal number of tools. In this study, productivity improvement was carried out by reducing the actual obstacle time in order to increase effective working time and tool efficiency.


Keywords


Productivity; Digging; Loading; Hauling Equipment.

Full Text:

PDF

References


Andi, S. (2019). Optimalisasi Produksi Alat Muat Dan Alat Angkut Untuk Pemindahan Batubara Pada Operasi Penanganan Batubara 4 Satker Penbara Blok Timur Di Pt. Bukit Asam Tbk, Kabupaten Muara Enim,Sumatera Selatan. (Skripsi Sarjana, Universitas Pembangunan Nasional ‘Veteran’ Yogyakarta, 2019).

Amir, F., Fanani, Y., & Sari, A. S. (2021). Analisis Produktivitas Alat Gali Muat Dan Alat Angkut Pada Penambangan Batugamping Pt. Semen Indonesia Tbk, Kabupaten Tuban Jawa Timur. PROSIDING, Seminar Teknologi Kebumian Dan Kelautan (SEMITAN III), 3(1), 288–296.

Bangun Artha. (2017). Limestone Mining & Lime Production https://bangunarta.co.id/limestone-mining-and-limestone-production, diakses pada 29 Januari 2023 pukul 18.27

Caterpillar. (2017). Caterpillar Performance Handbook Edition 29th. Caterpillar Inc., Deerfield, Illinois, U.S.

Fatimah, D., Tono, E. P. S. B. T., & Irvani. (2016). Evaluasi Kinerja Pemindahan Overburden Ditinjau Dari Produktivitas Alat Gali-Muat dan Alat Angkut di Front Kerja 2 TB 2.2 Tempilang Kabupaten Bangka Barat Mitra PT Timah (Persero) Tbk. Jurnal Mineral, 1(1), 1–8.

Ladianto, H. Z., & Ernawati, R. (2019). Evaluasi Produktivitas Alat Muat Dan Alat Angkut Untuk Memenuhi Target Produksi Bulanan Pengupasan Overburden Pada Penambangan Nikel Di Blok B Pt.Paramitha Persada Tama Provinsi Sulawesi Tenggara. PROSIDING, Seminar Teknologi Kebumian Dan Kelautan I (SEMITAN I).

Nasuhi, M., & Tono, T. E. P. S. B. (2017). Optimalisasi dan Produktivitas Alat Gali-Muat dan Alat Angkut pada Tambang Kabupaten Bangka Tengah (Optimization and Productivity of Excavator and Dump Truck in Granite Mining Activity of PT Vitrama Properti at Air Mesu Village, Pangkalan Baru Subdistrict, Central Bangka Regency). In Maret: Vol. II (Issue 1).

Undang-Undang Nomor 3 Tahun 2020 tentang Pertambangan Mineral dan Batubara, (2020).

Purba, F., Syahrudin, & Setiawati, S. (2021). Kajian Teknis Produktivitas Alat Gali Muat dan Alat Angkut untuk Mencapai Target Produksi 10.000 M^3/Bulan. Jurnal PWK, Laut, Sipil, Tambang, 8(2),

Pratama, G. R. (2014). Kajian Teknis Produktivitas Alat Gali Muat Dan Alat Angkut Pada Pemindahan Overburden Pt. Kalimantan Prima Persada Site Mass Asam-Asam Provinsi Kalimantan Selatan. (Skripsi Sarjana, Universitas Lambung Mangkurat, 2014).

Prayoga, D. A. (2020). Kajian Teknis Produksi Alat Gali Muat Dan Alat Angkut Pada Penambangan Batugamping Untuk Mencapai Target Produksi 700.000 Ton/Bulan Di Pt Indocement Tunggal Prakarsa Tbk Site Plant Citeureup, Kabupaten Bogor Jawa Barat. (Skripsi Sarjana, Universitas Pembangunan Nasional ‘Veteran’ Yogyakarta, 2020).

Qinthara, M. R., Azizi, M. A., Budhya, E. F., & Marwanza, I. (2022). Pengaruh Efisiensi Kerja Terhadap Konsumsi Bahan Bakar Alat Gali Muat Dan Angkut. Indonesian Mining and Energy Journal, 5(1), 24–32.

Ramadhan, Aziz S., Suciyanto, F., Wicaksono, & Ferdy, S. (2021). Batu Gamping. Bandung: ITB

Zulkifli. (2020). Kajian Teknis Produktivitas Alat Gali Muat dan Alat Angkut Batu Andesit Pada PT. Niat Karya di Kecamatan Utan Kabupaten Sumbawa Besar Provinsi Nusa Tenggara Barat. Jurnal Ulul Albab, 24(1), 46–52.

Preduanda, H., & Ansosry. (2019). Evaluasi Kinerja Alat Gali Muat dan Alat Angkut Untuk Mencapai Target Produksi Pada Penambangan Batukapur di Area 242 (Tajarang) PT. Semen Padang. Jurnal Bina Tambang, 4(3), 32–42.

Iranda, E., & Saldy, T. G., (2021). Evaluasi Kinerja Alat Gali Muat Dan Alat Angkut Untuk Mencapai Target Produksi 25.000 Ton/Bulan Pada Penambangan Batu Kapur PT. Bakapindo Di Jorong Durian, Kenagarian Kamang, Kecamatan Kamang Magek, Kabupaten Agam, Sumatera Barat. Jurnal Bina Tambang, 5(5), 257–266.




DOI: https://doi.org/10.31284/j.jemt.2024.v4i2.5561

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Raffaello Santoso Santoso

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.