The Effect of Stress Distribution Around The Decline Shaft on The Support System Stability in Underground Mining
Abstract
Keywords
Full Text:
PDFReferences
Z. T. Bieniawski, ROCK MECHANICS DESIGN IN MINING AND TUNNELING. 1984.
R. H. K. Putri, “Coal Pillar Strength Formula in Indonesian coal mines,” J. Earth Mar. Technol., 2020, doi: 10.31284/j.jemt.2020.v1i1.1147.
R. H. K. Putri, “Penentuan Lebar Chain Pillar Pada Tambang Batubara Shortwall Mining,” Indones. Min. Prof. J., 2020, doi: 10.36986/impj.v2i1.21.
Y. D. Galih C, G. S. Utami, and A. Khanifa, “The Influence of Structural Structures on Slope Stability at PT. Energi Batubara Lestari, South Kalimantan),” PROMINE, 2019, doi: 10.33019/promine.v7i1.1059.
M. Cai, P. K. Kaiser, and C. D. Martin, “Quantification of rock mass damage in underground excavations from microseismic event monitoring,” Int. J. Rock Mech. Min. Sci., 2001, doi: 10.1016/S1365-1609(01)00068-5.
A. Zamroni, O. Sugarbo, R. Prastowo, F. R. Widiatmoko, Y. Safii, and R. A. E. Wijaya, “The relationship between Indonesian coal qualities and their geologic histories,” 2020, doi: 10.1063/5.0006836.
S. E. Haryanto, B. Budiarto, A. S. Sari, and F. R. Widiatmoko, “No TKajian Teknis Sistem Penyaliran Tambang Dan Rancangan Sumuran Pada Pit Majapahit PT. Prolindo Cipta Nusantara, Kabupaten Tanah Bumbu, Kalimantan Selatanitle,” in Prosiding Seminar Nasional Sains dan Teknologi Terapan, 2019, pp. 539–544.
Y. D. G. Cahyono, “Technical Planning of Ventilation System to Support Development W Undercut in 2021 at PT. Freeport Indonesia Underground Mining,” J. Earth Mar. Technol., 2020, doi: 10.31284/j.jemt.2020.v1i1.1141.
W. E. C. Putri, A. Zamroni, and F. R. Widiatmoko, “PENGARUH AKTIVITAS PERTAMBANGAN TERHADAP NILAI PRODUK DOMESTIK REGIONAL BRUTO DAN EKONOMI MASYARAKAT DI PROVINSI KALIMANTAN TIMUR,” KURVATEK, vol. 5, no. 2, pp. 71–76, Dec. 2020, doi: 10.33579/krvtk.v5i2.1854.
B. H. G. Brady and E. T. Brown, Rock Mechanics for underground mining: Third edition. 2006.
F. R. Widiatmoko, A. Zamroni, M. A. Siamashari, and A. N. Maulina, “REKAMAN STASIUN GPS SEBAGAI PENDETEKSI PERGERAKAN TEKTONIK, STUDI KASUS: BENCANA TSUNAMI ACEH 26 DESEMBER 2004,” 2019.
E. Hoek and E. T. Brown, “Practical estimates of rock mass strength,” Int. J. rock Mech. Min. Sci. Geomech. Abstr., 1997, doi: 10.1016/S0148-9062(97)00305-7.
E. Hoek and E. T. Brown, “The Hoek–Brown failure criterion and GSI – 2018 edition,” J. Rock Mech. Geotech. Eng., 2019, doi: 10.1016/j.jrmge.2018.08.001.
G. Herget and S. Vongpaisal, “Proceedings of the 6th congress of the International Society for Rock Mechanics, Montreal, 1987. Three volumes.,” Proc. 6th Congr. Int. Soc. Rock Mech. Montr. 1987. Three Vol., 1987.
K. Terzaghi and F. E. Richart, “Stresses in rock about cavities,” Geotechnique, 1952, doi: 10.1680/geot.1952.3.2.57.
P. R. Sheorey, “A theory for In Situ stresses in isotropic and transverseley isotropic rock,” Int. J. Rock Mech. Min. Sci., 1994, doi: 10.1016/0148-9062(94)92312-4.
M. Li, J. Zhang, Z. Wu, and K. Sun, “Calculation and monitoring analysis of stress distribution in a coal mine gob filled with waste rock backfill materials,” Arab. J. Geosci., 2019, doi: 10.1007/s12517-019-4584-9.
Z. T. Bieniawski, “Engineering classification of jointed rock masses. discussions of paper by Z.T. Bieniawski, trans. s. afr. instn. civ. engrs. v15, n12, Dec. 1973, and authors reply,” Int. J. Rock Mech. Min. Sci. Geomech. Abstr., 1974, doi: 10.1016/0148-9062(74)92075-0.
J. M. Galvin, Ground engineering - principles and practices for underground coal mining. 2016.
DOI: https://doi.org/10.31284/j.jemt.2021.v2i1.1726
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Diana Irmawati Pradani
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.