Infrastructure development in this globalization era has increased rapidly in line with the need for residential space, businesses, and buildings. Building construction projects have limitations, including cost limits or cost overruns. The conditions of proper use that are less efficient due to the development plan’s location can lead to several risks during construction work. This study aims to identify and analyze the factors influencing cost overruns and determine the most dominant causal factor in cost overruns. By giving questionnaires to 40 respondents, the data were collected and then treated for validity, reliability, normality, and statistical tests through SPSS software. The analysis of the data tested indicated that all variables were declared valid because the results of the correlation between the respondents' answers to each question item obtained a significant value, namely rcount> rtable. The reliability test showed that the Cronbach alpha value of all variables was above 0.600. In conclusion, it was very reliable and could be trusted to be used as a variable measuring tool. The most dominant factors causing cost overruns in the Office Waringin Group project consisted of new work items at a mean of 4.33.
Keywords
Full Text:
PDFReferences
Bukhori. (2018). Factors that cause cost overruns in building construction in the city of Cirebon. Faculty of Engineering, Universitas Swadaya Gunung Jati, vol. Xxii no. 1 April 2018, 12-22.
Dapu, Y. C. (2016). Factors that cause cost overrun in construction projects. Journal of Civil Statics Universitas Sam Ratulangi Manado, Vol.4 No.10 October 2016 (641-647) ISSN: 2337-6732, 641-647.
Fahirah, F. (2005). IDENTIFY THE CAUSES OF OVERRUN OF BUILDING CONSTRUCTION PROJECT COSTS. 160-168.
Febriantoro, M. B., Susanto, S., &; Siswanto, E. Minimizing Time Delays and Cost Overruns of Dongko Sub-District Building Construction Project, Trenggalek with the Earned Value Method. Journal of Technology Management and Civil Engineering (JURMATEKS) (2022), 5(1), 104-118.
Iriana, R. T. K., Sebayang, M., &; Yogi, M. R. A (2022) Analysis of the dominant factors causing cost overrun in small category government building construction projects in Pekanbaru City. Journal of civil technology and engineering, 1(1), 37-43.
Nurtsani, R. A., Septiadi, D. R., &; Suharyanto, S. Project Cost and Time Control with the Earned Value Concept Method. Journal of Civil Engineering Works (2017), 6(4), 460-470.
Pandey, R. D. (2012). Analysis of factors causing equipment cost overrun in dock construction projects in North Sulawesi. Scientific journal of media engineering, Vol. 2, No. 3, September 2012 ISSN 2087-9334 (153-162), 94-101.
Purnomo, A. Subki, A. Factors affecting cost overruns for Owners in the implementation of road infrastructure projects with foreign loan funding sources, Faculty of Engineering, State University of Jakarta, 13220, Volume III No. 1, January 2008, 1-18.
Remi, F. F. (2017). Study of the factors causing cost overrun in building construction projects. Master Program in Civil Engineering, Parahyangan Catholic University, Bandung, Vol. 06, No. 2, March 2017, 94-101.
Sahusilawane, T., Bisri, M., &; Rachmansyah, A. Analysis of Factors Causing Cost Overrun in Building Construction Projects in Ambon City. Civil Engineering (2012), 5(2), 118-128.
Sari, M. M., Hadi, S. &; Aldiansyah. (2020). Factors causing cost overruns that affect the final cost of building construction projects. Civil Engineering Study Program, Serang Raya University, April 21, 2020, 59-67.
DOI: https://doi.org/10.31284/j.jcepd.2023.v2i2.4747
Refbacks
- There are currently no refbacks.
Journal of Civil Engineering, Planning and Design by FTSP-ITATS .
Based on a work at https://ejurnal.itats.ac.id/jcepd.