Current Mapping on the UBS Surabaya Office Building Construction Project
Abstract
Full Text:
PDFReferences
LA Geraldi and H. Sulistio, “Study of Analysis of the Percentage Analysis of Reinforced Steel and Its Causing FactorsLow-Rise Buildings in Jakarta,” JMTS J. Mitra Tek. Civil, vol. 3, no. 1, p. 167, 2020, doi: 10.24912/jmts.v3i1.7070.
FT Nuciferaniet al., "Application of Lean Construction in Housing Projects against Waste Material," pp. 1–6, 2022.
D. Jones and J. Womack,Seeing the Whole. 2002.
Y. Maulana, "Identification of Waste Using the Value Stream Mapping Method in the Housing Industry,"J.Ind. Eng. Pass. Manag., vol. 2, no. 2, 2019, doi: 10.31602/jieom.v2i2.2934.
A. Triandini, R. Waluyo, and W. Nuswantoro, "Concept and Implementation of Waste Management for Contractors in Palangkaraya,"J.Tek., vol. 2, no. 2, pp. 90–100, 2019, [Online]. Available: https://e-journal.upr.ac.id/index.php/JT/article/download/1288/1064
B. Singh, SK Garg, and SK Sharma, “Value stream mapping: Literature review and implications for Indian industry,”int. J. Adv. Manuf. Technol., vol. 53, no. 5–8, pp. 799–809, 2011, doi: 10.1007/s00170-010-2860-7.
DOI: https://doi.org/10.31284/j.jcepd.2023.v2i1.4561
Refbacks
- There are currently no refbacks.
Journal of Civil Engineering, Planning and Design by FTSP-ITATS .
Based on a work at https://ejurnal.itats.ac.id/jcepd.