Analisis Line Balancing pada Line x cc Machining Department di Perusahaan Otomotif untuk Peningkatan Kapasitas Produksi
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
M. Afifuddin, “Penerapan Line Balancing Menggunakan Metode Ranked Position Weight (RPW) untuk Meningkatkan Output Produksi pada Home Industri Pembuatan Sepatu Bola,”
J. Ind. Eng. Manag., vol. 4, no. 1, pp. 38–46, Apr. 2019, doi: 10.33536/jiem.v4i1.287.
H. H. Azwir and H. W. Pratomo, “Implementasi Line Balancing untuk Peningkatan Efisiensi di Line Welding Studi Kasus: PT X,” J. Rekayasa Sist. Ind., vol. 6, no. 1, p. 57 63, Apr. 2017, doi: 10.26593/jrsi.v6i1.2428.57-64.
R. Prabowo, “Penerapan Konsep Line Balancing Untuk Mencapai Efisiensi Kerja Yang Optimal Pada Setiap Stasiun Kerja Pada Pt. Hm. Sampoerna Tbk,” J. IPTEK, vol. 20, no. 2, pp. 9–19, Dec. 2016, doi: 10.31284/j.iptek.2016.v20i2.25.
R. D. Astuti and H. S. A. Edy purwanto, “Perbaikan Line Balancing Proses Packing Tablet Xyz Menggunakan Metode Ranked Positional Weight Di Pt. Y,” Performa Media Ilm.
Tek. Ind., vol. 18, no. 1, Jul. 2019, doi: 10.20961/performa.18.1.32360.
D. Pujotomo and D. N. Rusanti, “Usulan Perbaikanuntuk Meningkatkan Produktivitas Fillingplant Dengan Pendekatan Lean Manufacturing Pada Pt Smart Tbk Surabaya,” JTI UNDIP J. Tek. Ind., vol. 10, no. 2, pp. 123–132, Jun. 2015, doi: 10.12777/jati.10.2.123-132.
R. I. Purnama and Z. F. Ikatrinasari, “Perbaikan Sistem Produksi Minyak Angin Aromatherapy Melalui Lean Manufacturing Di Pt. Us, Jawa Barat,” JTI UNDIP J. Tek. Ind., vol. 8, no. 2, pp. 99–106, Jun. 2013, doi: 10.12777/jati.8.2.99-106.
W. N. Cahyo, “A Proposed Framework to Apply Operational Excellence (opex) as a Business Strategy,” J. Eng. Manag. Ind. Syst., vol. 7, no. 1, pp. 15–24, May 2019, doi: 10.21776/ub.jemis.2019.007.01.3.
H. Srijayasari, P. Pratikto, and F. Gapsari, “Designing Line Balancing for Ammunition Box Production Using Heuristic Method,” J. Eng. Manag. Ind. Syst., vol. 6, no. 2, pp. 105–113, Dec. 2018, doi: 10.21776/ub.jemis.2018.006.02.5.
S. Saiful, M. Mulyadi, and T. M. Rahman, “Penyeimbangan Lintasan Produksi Dengan Metode Heuristik (studi Kasus Pt Xyz Makassar),” J. Tek. Ind., vol. 15, no. 2, pp. 182–189, Mar. 2016, doi: 10.22219/JTIUMM.Vol15.No2.182-189.
H. D. Purnomo, H.-M. Wee, and H. Rau, “Harmony Search for Balancing Two-sided Assembly Lines,” J. Tek. Ind., vol. 14, no. 2, Jun. 2011, doi: 10.9744/jti.14.2.83-88.
V. Kitriastika, P. I. Tanaya, and Y. Indrayadi, “A Redesign Layout to Increase Productivity of a Company,” J. Ilm. Tek. Ind., vol. 12, no. 1, pp. 83–95, 2013.
O. Sunny, A. L. Maukar, and I. W. Sosodoro, “Perancangan Kapasitas Produksi Produk Electronic Control Unit (Ecu),” JIE Sci. J. Res. Appl. Ind. Syst., vol. 4, no. 1, p. 53, Aug. 2019, doi: 10.33021/jie.v4i1.748.
T. Baroto, Perencanaan dan Pengendalian Produksi. Jakarta: Ghalia Indonesia, 2002.
I. Dharmayanti and H. Marliansyah, “Perhitungan Efektifitas Lintasan Produksi Menggunakan Metode Line Balancing,” J. Manaj. Ind. Dan Logist., vol. 3, no. 1, pp. 45–56, May 2019, doi: 10.30988/jmil.v3i1.63.
O. Tiovani, “Perbaikan Proses Produksi Menggunakan ECRS Based Line Balancing pada Lini Perakitan Stator 4,” Performa Media Ilm. Tek. Ind., vol. 18, no. 1, Jul. 2019, doi: 10.20961/performa.18.1.30202.
B. W. Niebel and A. Freivalds, Niebel’s methods, standards, and work design, Thirteenth edition. New York, NY: McGraw-Hill, 2014.
S. Wignjosubroto, Ergonomi Studi Gerak dan Waktu. Surabaya: Guna Widya, 2003.
DOI: https://doi.org/10.31284/j.iptek.2020.v24i1.703
Refbacks
- There are currently no refbacks.