Peningkatan Akurasi Perkiraan Biaya dan Waktu Proyek Perangkat Lunak Berdasarkan Model Fuzzy Gaussian dan Perubahan Nilai Parameter
Abstract
Keywords
Full Text:
PDF (Bahasa Indonesia)References
A. C. Eberendu, “Software Project Cost Estimation : Issues , Problems and Possible Solutions,” Int. J. Eng. Sci. Invent., vol. 3, no. 6, pp. 38–43, 2014.
F. Soleimanian Gharehchopogh, I. Maleki, A. Kamalinia, and H. M. Zadeh, “Artificial bee colony based constructive cost model for software cost estimation,” J. Sci. Res. Dev., vol. 1, no. 2, pp. 44–51, 2014.
K. T. Le My, “Applying Teaching-Learning To Artificial Bee Colony for Parameter Optimization of Software Effort,” J. Eng. Sci. Technol., no. August, 2016.
F. S. Gharehchopogh and A. Pourali, “A new approach based on continuous genetic algorithm in software cost estimation,” J. Sci. Res. Dev., vol. 2, no. 4, pp. 87–94, 2015.
C. S. Reddy and K. Raju, “An Improved Fuzzy Approach for COCOMO ’ s Effort Estimation using Gaussian Membership Function,” J. Softw., vol. 4, no. 5, pp. 452–459, 2009.
T. N. Sharma, “Analysis of Software Cost Estimation using COCOMO II,” Int. J. Sci. Eng. Res., vol. 2, no. 6, pp. 1–5, 2011.
C. H. S. Reddy and K. Raju, “Improving the accuracy of effort estimation through Fuzzy set combination of size and cost drivers,” WSEAS Trans. Comput., vol. 8, no. 6, pp. 926–936, 2009.
E. Stimation, “A Fuzzy Approach For Software Effort Estimation,” Int. J. Cybern. Informatics, vol. 2, no. 1, pp. 9–15, 2013.
A. Malik, V. Pandey, and A. Kaushik, “An Analysis of Fuzzy Approaches for COCOMO II,” Int. J. Intell. Syst. Appl., vol. 5, no. 5, pp. 68–75, 2013.
J. G. Borade and V. R. Khalkar, “Software Project Effort and Cost Estimation Techniques,” Int. J. Adv. Res. Comput. Sci. Softw. Eng., vol. 3, no. 8, pp. 730–739, 2013.
S. Waghmode and K. Kolhe, “A Novel Way of Cost Estimation in Software Project Development Based on Clustering Techniques,” Int. J. Innov. Res. Comput. Commun. Eng., vol. 2, no. 4, pp. 3892–3899, 2014.
R. R. Putri, R. Sarno, D. Siahaan, A. S. Ahmadiyah, and S. Rochimah, “Accuracy Improvement of the Estimations Effort in Constructive Cost Model II Based on Logic Model of Fuzzy,” Adv. Sci. Lett., vol. 23, no. 3, pp. 2478–2480, 2017.
I. Attarzadeh and S. Ow, “Improving the accuracy of software cost estimation model based on a new fuzzy logic model,” World Appl. Sci. J. 2010.
S. Adhimantoro, “Mengetahui Tingkat Kematangan Buah Dengan Ultrasonik Menggunakan Logika Fuzzy,” JNTETI, vol. 3, no. 1, pp. 1–6, 2014.
T. K. G. Marappagounder, “An Efficient Software Cost Estimation Technique Using Fuzzy Logic With The Aid Of Optimization Algorithm,” Int. J. Innov. Comput. Inf. Control, vol. 11, pp. 587–597, 2015.
DOI: https://doi.org/10.31284/j.iptek.2018.v22i2.447
Refbacks
- There are currently no refbacks.